EU product regulations 2027: dates to plan for

5 min read
EU product regulations 2027 in one calendar: machinery, batteries, customs, cybersecurity, forced labour and UK labels, with what to prepare for each date.

You plan production, stock and launches for 2027 and sell in the EU, the UK or both. This calendar of EU product regulations 2027 shows the nine EU dates and two UK dates that change what a product needs, with the legal basis, who each date affects and what to prepare now.
Why each 2027 date applies to every unit you ship
EU product law looks at the individual unit, not the model (Blue Guide 2022 (opens in a new tab), section 2.3). A long-selling model therefore needs the new requirements for every unit placed on the market after the deadline.
A directive works through national law, so its date is a deadline for governments, not for you.
Two rules already apply before 2027: Cyber Resilience Act reporting since 11 September 2026, and the Product Liability Directive for products placed on the market after 9 December 2026 (Article 2(1) of Directive (EU) 2024/2853 (opens in a new tab); see our article).
The 2027 calendar at a glance
| Date | Rule | What changes | Main article |
|---|---|---|---|
| 1 January | F-gas Regulation (EU) 2024/573 | Ban on certain heat pumps, air conditioners and small chillers with F-gases of GWP 150 or more | F-gas rules 2027 |
| 20 January | Machinery Regulation (EU) 2023/1230; GB: SI 2026/867 | Replaces the Machinery Directive in the EU and Northern Ireland; Great Britain allows machinery that meets it | Machinery checklist |
| 18 February | Batteries Regulation (EU) 2023/1542 | Removable portable batteries, QR codes, battery passports | Battery rules 2027 |
| 17 June | Directive (EU) 2025/1892 | Transposition deadline for textile EPR | Section below |
| 18 August | Batteries Regulation, Article 48 | Battery due diligence for large operators | Battery rules 2027 |
| 21 September | Union Customs Code (EU) 2026/2108 | Release data name your EU economic operator | Customs reform |
| 10 October | REACH Annex XVII, entry 79 | PFHxA limits for further consumer textiles | Section below |
| 11 December | Cyber Resilience Act (EU) 2024/2847 | Cybersecurity requirements for products with digital elements | Connected machines |
| 14 December | Forced Labour Regulation (EU) 2024/3015 | Ban on products made with forced labour | Section below |
| 31 December | GB: SI 2022/1393 | End of two labeling easements | UKCA or CE |
Textile EPR, PFHxA and forced labour
17 June. Member states must transpose Directive (EU) 2025/1892 (opens in a new tab) on extended producer responsibility (EPR) for textiles and footwear by this date (Article 2(1)) and set up the schemes by 17 April 2028 (new Article 22a(14) of the Waste Framework Directive). A brand outside the EU that sells directly to end users in a member state counts as producer there (new Article 3(4b)(d)); each member state may require it to appoint an EPR representative (new Article 22a(3)).
10 October. The second PFHxA stage covers textiles, leather, furs and hides for the general public other than clothing and related accessories: PFHxA and its salts are limited to 25 ppb, related substances to 1,000 ppb (REACH Annex XVII, entry 79(2), added by Regulation (EU) 2024/2462 (opens in a new tab)). Articles placed on the market before that date are exempt (entry 79(8)).
14 December. Economic operators may not place or make available on the EU market, or export, products made with forced labour (Articles 3 and 39 of Regulation (EU) 2024/3015 (opens in a new tab)). Online offers targeted at end users in the EU count as making available (Article 4). The Regulation adds no due diligence duty of its own (Article 1(3)).
How to turn the calendar into a plan
- Map products to dates, including parts such as batteries, refrigerants and textile components.
- Set a cut-off per rule and align production, shipping and stock with it. A column per date in your stock list shows which units can still be sold under the old rules.
- Ask suppliers early for refrigerant data, PFHxA test results, battery data and supply chain information.
- Update documents and labels: technical file, Declaration of Conformity, instructions, battery QR code, UK markings.
- Name an owner and a deadline for each task, and review the plan when new acts are adopted; this calendar lists adopted law only.
Conclusion: 2027 is a planning year
What decides compliance in 2027 is which units leave your factory when, and whether documents, labels and supplier data are ready. With Regulatory Readiness, we list the rules and dates that apply to each of your products and markets and turn them into a roadmap with owners and deadlines.
With Market Growth & Intelligence, we follow new rules for the product categories and markets we agree with you. Both work within the agreed scope and mandate; you remain the manufacturer and decide what to change.
How Representa can help
Frequently asked questions
Can I still sell machinery built to the Machinery Directive after 20 January 2027?
Units placed on the market in conformity with Directive 2006/42/EC before 20 January 2027 may still be made available (Article 52(1) of Regulation (EU) 2023/1230, as corrected). Every unit placed on the market from that date must meet the Machinery Regulation.
Does the Cyber Resilience Act apply to products already on the market?
Products placed on the EU market before 11 December 2027 must meet its requirements only if they are substantially modified from that date (Article 69(2) of Regulation (EU) 2024/2847). The reporting duties of Article 14 already apply to them (Article 69(3)).
What changes for UKCA labels at the end of 2027?
Until 11pm on 31 December 2027, the UKCA marking may be on a label or accompanying document, and importer details for goods from an EEA state, or in some cases Switzerland, may appear elsewhere than on the product (SI 2022/1393). After that, the general marking rules of each GB regulation apply.
Upcoming webinar
EU Machinery Regulation, Day One: Can your next machine enter Europe?
- 16:30 CET · 15:30 UK · 10:30 US Eastern
- Live online · 30 minutes · Free



